The new Wisła Płock stadium

Using BIM to design the electrical and teletechnical installations for a new stadium of the Wisła Płock football club. A facility with roofed stands...

Find out more
Case study

The new Wisła Płock stadium

Using BIM to design the electrical and teletechnical installations for a new stadium of the Wisła Płock football club. A facility with roofed stands for ca. 15,000 spectators along with the social and office areas and the necessary infrastructure.

Find out more
Case study

New UWM faculties

We designed the electrical and teletechnical installations for the new facilities of the Law and Administration Faculty as well as the Social Sciences Faculty of the University of Warmia and Mazury in Olsztyn.

Find out more
Case study

New sports hall in Mielec

Investment area of almost 28,000 sq. m. Using BIM, we designed the electrical and teletechnical installations for a new Municipal Center of Sport and Recreation Arena in Mielec.

Find out more
Case study

Swimming pool in Stargard

See the new swimming pool at the Municipal Center of Sport and Recreation in Stargard. Our studio was responsible for preparing a BIM design of the electrical installations for the facility.

Find out more
Case study

Apartamenty Dragonów

A remarkable spot in Olsztyn – Apartamenty & Lofty Dragonów – is a multifamily building with business and service spaces. We have been involved in designing the electrical installation in the multifamily building.

Find out more

biuro@pradma.pl

Olsztyn, ul. Lubelska 33

Gdynia, al. Zwycięstwa 96/98

Do góry
Zamknij menu